Touchline Signal — Soccer scouting research
Share your expertise
Readiness quiz

Which blockers override a high score?

Touchline Signal research deskSection 08Page 5 of 9Last updated 3 Nov 2026
Hands reviewing the clauses of a paper contract

Under this framework, the following conditions take precedence over the numerical band.

Before starting a scored supplier trial

Require at least 2 points on Questions 1, 3, 4, 6, 10, 11, 13 and 14. Together these establish a defined decision, testable need, coverage scope, common tasks, authorised use, controlled handling, available evaluators and agreed measurement.

If any falls below 2, label the result “Preparation required: trial not yet ready.” Public research and clarification discussions can continue; do not carry out an affected export, upload or processing activity without the necessary authorisation.

Example: a club scoring 42/45, with 3 points everywhere except 0 on licensing, is still not ready to start the intended data-processing trial.

Before using findings or approving a purchase

Apply these proposed rejection and escalation rules:

  • Unresolved player identity: quarantine the affected record and conclusions until resolved.
  • Missing mandatory footage or fields: mark the supplier as failing that requirement unless the buyer approves a documented scope change and retest.
  • Unsupported material claim: exclude it from the decision evidence; investigate whether the problem is isolated or systematic.
  • Prohibited essential workflow: do not buy for that workflow without an agreed, authorised alternative.
  • Untested replacement dependency: do not cancel the incumbent until the dependency has been checked.

Any scope change must be visible and applied consistently across suppliers. Do not quietly lower a requirement after seeing a preferred supplier’s results.

Download research